The Broadway Tunnel under Fort Moore Hill. Los Angeles High School is in upper left. |
|
Overview | |
---|---|
Location | Los Angeles, California |
Status | Demolished for construction of Hollywood Freeway |
Route | North Broadway |
Start | Sand Street (later California Street), one block north of Temple Street |
End | North side of Fort Moore Hill |
Operation | |
Work begun | November 2, 1899 |
Opened | August 17, 1901 |
Closed | June 2, 1949 |
Owner | The city |
Character | Street traffic |
Technical | |
Length | 760 feet (230 m) |
Number of lanes | Two |
Tunnel clearance | 22 feet (6.7 m) |
Width | 40 feet (12 m) |
Grade | 6 in 100 |
The Broadway Tunnel was a tunnel that ran under Fort Moore Hill in Los Angeles, California, downtown, extending North Broadway (formerly Fort Street), at Sand Street (later California Street), one block north of Temple Street, northeast to the intersection of Bellevue Avenue (later Sunset Boulevard, now Cesar Chavez Avenue), to Buena Vista Street (now North Broadway).
The proposal for opening Broadway through to Buena Vista Street, and extending the street south into what was then part of Main Street, below Tenth Street, in order to give a continuous, wide thoroughfare from the southern city limits to the Eastside, was made as early as February 1891.[1]
Plans were prepared by the city engineer's office in early March 1895.[2] The main argument for its construction was that a tunnel providing an additional opening on the north would decrease the constantly increasing traffic (of horses, buggies and wagons, etc.), which was causing a dangerous jam at the corner of First and Spring Streets.[3]
Work began on the Broadway Tunnel on November 2, 1899, with about 25 men with teams (of animals) moving obstructions out of the way in preparation for the actual excavation,[4] from the north approach.[5] Early on the morning of January 20, 1900, a laborer was buried under about 20 tons of falling earth at the north end of the tunnel. The timbers used as braces fell over the man in such a manner that he was saved from being crushed to death.[6]
The tunnel was completed and opened for traffic on Saturday, August 17, 1901.[7] The cost in its construction was $66,000.[8] It was 760 feet (230 m) long, 40 feet (12 m) wide and 22 feet (6.7 m) high, with a grade of 6 in 100, falling toward the east.[9]
According to an article in the Los Angeles Times, the Third Street Tunnel, which was nearing completion at the time, could have been put inside the Broadway Tunnel leaving enough room for a sidewalk 8 feet (2.4 m) wide. The tunnel required more than 50,000 cubic yards (38 227.75 m3) of elevation, 4,000 cubic yards (3 058.22 m3) of concrete and 1.25 million of bricks to line it. With the exception of the tunnel in Fairmount Park in Philadelphia, which was 41 feet (12 m) in diameter, but only 140 feet (43 m) long, the Broadway Tunnel was the widest tunnel of its type in the United States, and possibly in the world, at that time.[10]
In 1915, the tunnel was closed for reconstruction. The roadway was lowered to decrease the grade, wood block flooring was installed to provide a noiseless surface for the heavy traffic of teams and automobiles that would be passing through, and a false roof built inside the original shell. Because of the lowering, it was necessary to make a cut of 14 feet (4.3 m) in California Street, and to change the grade of North Broadway from Temple Street to the tunnel. The concrete archway of the Broadway Tunnel was 20 feet (6.1 m) high, and the entire bore was lined with white glazed tile. The stairway on the outer face of the southern portal was extended to a rise of 65 feet (20 m) to Fort Moore Hill.[11]
The work was completed and the tunnel reopened in early February 1916. Due to the importance of the artery of travel, through which thousands of automobiles, teams and pedestrians would be passing daily, an event was held on Saturday, February 19, formally turning the tunnel over to the city, with the Automobile Club of Southern California in charge.[11]
The Broadway Tunnel was closed on June 2, 1949,[12] and was demolished for the construction of the Hollywood Freeway.[13][14] The route cut through Fort Moore Hill and made it necessary for a Broadway overpass to be built across the freeway and the old tunnel site.
|
|